+91-832-2512152
contactus[at]goashipyard[dot]com
CIN : U63032GA1967GOI000077
GST DetailsSitemap
flagहिन्दी (Hindi)
flagEnglish

A- A A+

GSL Logo English
Image of CRISIL
Image of ITQCR
Image of Make in India
Image of Swachh Bharat Abhiyan
Image of National Emblem of India
  • Home
  • About Us
    • Introduction
    • History
    • Vision & Mission
    • Acts and Rules
    • Organization Chart
    • Team Behind
      • Chairman & Managing Director
      • Board of Directors
      • Senior Management
      • Code of Business Conduct and Ethics
    • Corporate Objective
    • Quality Policy
    • Programmes & Schemes
    • Who’s who
    • Annual Reports
      • Financial Year Wise Annual Reports
      • Investor Services
    • Goa Shipyard Darshan
    • ISO Certificate
    • Human Resource Development
    • Right To Information Act
  • Services
    • Services Offered
    • Ship Repair / Ship Refit
    • Ship Modernisation / Ship Conversion
    • GES (General Engineering Services)
  • Products
    • Product History
      • Mine Counter Measure Vessel (MCMV)
      • New Version 105M. Advanced Offshore Patrol Vessel (AOPV)
      • 29 M. Interceptor Craft
      • 14 M. Medium Speed Patrol Boat
      • 15 M. High Speed Patrol Boat
      • 35 Knots High Speed FRP Interceptor Craft
      • 40 Knots High Speed FRP Interceptor Craft
      • 35 Knots, 50 M. Fast Patrol Vessel (FPV) (Waterjet Propulsion)
      • 90 M. Offshore Patrol Vessel (90 M. OPV)
      • 105 M. Advanced Offshore Patrol Vessel (AOPV)
      • Naval Offshore Patrol Vessel (NOPV)
      • Damage Control Simulator (DCS)
      • Sail Training Ship (STS)
      • Survey Motor Boat
  • Clients
  • Facilities
    • IPR Cell
    • Shiplift Facility
    • Building Bays, Slipsways & Outfitting Jetty
    • Steel Preparation Shop & Aluminium Fabrication Shop
    • Air Conditioned Store & Electronic Workshop
    • CAD / CAM
  • Vigilance
    • Vigilance Set up in GSL
    • CVO Profile
    • Objectives
    • CVC Act
    • CVC Vigilance Manual
    • IP and IEM
    • Policies and Guidelines
      • Complaint Handling Policy in GSL
      • PIDPI Resolution
      • Whistle Blower
    • Register a Complaint
      • By E-mail
      • By Post
    • Vigilance Awareness Week
    • Vigilance Gallery
    • Systemic Improvements in GSL
  • CSR
    • Corporate Social Responsibility
    • CSR Projects
    • Swachh Bharat Abhiyan
    • Yearwise CSR Expenditure
    • CSR & Sustainability Policy
    • Composition of CSR Committee
    • Glimpses of CSR Activities
    • CSR News Clippings
  • Vendor
    • Supplier Bill Status
    • Annual Procurement Plan for MSME Vendors
    • Annual Procurement Plan for MSME FY 2021-22
    • Vendor Status
    • Vendor Registration Policy
    • GSL Online Vendor Registration System
    • Vendor Holiday Policy
    • Vendor Rating Process
    • Vendor Registration Form
    • Application for Enrollment as Civil Contractor
    • ECS/RTGS Mandate Form for Suppliers
    • Terms and Conditions
    • Financial Support to MSMEs in ZED Certification Scheme
  • Notice Board
    • Tenders
      • GSL Procurement Manual
      • Open Tenders
      • Limited Tenders
      • Expression of Interest (EOI)
      • Supplier Bill Payment Status
      • GSL-E-procurement
      • GSL TReDS system login
    • News
    • Circulars
    • Work Orders Issued
    • Notifications
    • Gallery
      • Awards & Achievements
      • GSL in the News
      • News and Events
      • Videos
      • Delivered ahead of schedule
    • Scholarship Scheme For SC /ST /OBC Student
    • Careers
      • GSL Career
      • Advertisement
      • Policy & Scheme
      • GSL s Equal Opportunity Policy for Persons with Disabilities
      • National Career Service
  • Contact Us
    • Locate Us
    • GSL Chatbot
  • PRMS 2023-24 Whats new
    • Higher Pension Eligibility Criteria
    • Annexure-B
    • Circular
    • FAQ’s

Terms and Conditions

Home Vendor Terms and Conditions
Standard terms & conditions of supplies [indigenous]

  1. Prices:
    The prices should be fixed and firm till execution of entire order.
  2. Packing and Forwarding
    All the materials should be strongly and securely packed in minimum cubic space in such a manner so as to prevent damage /pilferage during transit from point shipment to destination. Material parts wherever necessary should be slushed to prevent rust in transit. Loss/damage arising from insufficient & improper packing should be borne by the supplier. Each packing should be clearly marked & numbered upon four sides of the top thereof. Each packing should contain its own copies of delivery challan /invoice and packing list. Packing & Forwarding charges should be included in your offer.
  3. Excise duty
    Central Excise dury is not applicable the issue against the issue of Excise duty Exemption Certificate issued by WIPS Goa/GSL. However, if the same is not acceptable to the Excise Authorities than Central Excise Duty as applicable at the time of supply will be paid extra at actuals against documentary proof. Present rate if Excise Duty is to be indicated in Firm’s offer. Variation in Excise Duty rate will be applicable only up to contractual delivery date.
  4. Central Sales Tax/Local Sales Tax
    Central Sales Tax/Local Sales Tax as applicable will be paid extra at actuals against the issue of Central Sales Tax declaration Form ‘C’. Form XI . Please indicate the percentage of CSST/ST applicable. Also indicate your CST Registration No./Sales Tax Registration No. Variation in Sales Tax will be applicable only up to the contractual delivery date.
  5. Central Duty on Imported Items
    Custom Duty Exemption Certificate for the components if required will be provided by Goa Shipyard and hence Customs Duty will not be applicable. List of imported components along with breakup cost should be submitted along with your offer.
  6. Mode of Dispatch/Freight
    The equipment /item should be dispatched by road through GSL authorized transporters as indicated in GSL. Purchase Order on door delivery basis. The Freight charges are to be included in the quoted prices.
  7. Insurance
    The transit insurance of the consignment should be arranged by the firm covering all transit risks up to the destination. The insurance charges are to be included in the quoted prices.
  8. Inspection & Inspection Certificates
    The equipment /materials will be inspected, approved & certified at various stages of manufacture, by an authorized rep. of the inspection authorities, as mentioned in GSL Enquiry/Order. All facilities required for carrying out the inspection & test should be provided by the firm without any extra cost to GSL.4 copies of manufacturers Production & test certificates and inspection certificates issued by the inspection authority should be supplied along with the material shop test data, calibration certificates, type approval certificate to be provided with supply wherever applicable. Receipt inspection will be carried out by SL & owner’s Representative on receipt or the material at GSL yard. In case of rejection if any, the same to be rectifies/replaced by firm at their cost.
  9. Inspection charges
    Inspection charges if any, to be included in the quoted price.
  10. Drawings & Manuals
    4 sets of drawing need to be submitted for GSL approval within 4 weeks from the date of receipt of purchase order in case of revision /comments drawings should be submitted again for approval before commencing manufacturing. One set of velograph with six prints of each drawings need to be supplied along with the equipment. In addition six sets of Operation, Maintenance manuals & Comprehensive part list/part identification list are to be supplied wherever applicable.
  11. Payments
    100% payment with taxes and duties will be made within 30 days of receipt & acceptance material at GSL stores along with inspectors’ certificate & on submission of Performance Guarantee for 10% of the order value till the guarantee period.
  12. Cancellation of Order
    In the event the progress in respect of preparation & submission of drawings or manufacturing equipment is found to be unsatisfactory. GSL reserves the right to cancel the order without financial implication to GSL.
  13. Penalty
    In case if the firm fails to deliver the materials as per the stipulated period a penalty of 1% per week of delay will be leviable subject to maximum of 10% of the value of order.
  14. Risk Purchase
    In case if the firm fails to deliver the material as per the stipulated delivery GSL shall be entitled to cancel the order at GSL option and procure the material from all sources. Difference in cost if any, will be recovered from the firm.
  15. Guarantee
    The firm will take the full responsibility for the satisfactory performance of the equipments a minimum period of 12 months from the date of commissioning of each ship or 36 months from the date of receipt of each equipment in our yard which ever is earlier. During this period faulty material and defective design and the same will be rectified .replaced part or what ever free of cost at GSL. For defects rectified during the guarantee period, the guarantee period will be further extended by another 6 months for the repaired /replaced items only. The warranty is subject to proper storage, handling and usage of the equipment. Defects, damage and short landings reported during the receipt inspection at GSL and during the guarantee period shall be attended within 2 weeks from the date of intimation.
  16. Installation & Commissioning Assistance
    The firm will arrange Service Engineers for technical supervision during installation setting of work, commissioning at GSL & trails including HATS & SATS as and when required by GSL. The charges for the same to be included in the quoted prices.
  17. Bar Chart
    In order to monitor the progress of the manufacturing of the equipments /item, the firms should submit the Bar chart indicating major activities on cardinal events and major milestones along with complete details of their subcontracted items within 4 weeks
  18. Preservation
    The equipment should be supplied duty preserved suitable for 24 months storage from the date of receipt inspection cost of preservation is to be included in the quoted prices. Preservation and de-preservation procedure should be included in firm’s manual.
  19. Force Majeure
    The firm will not under any circumstances be liable for any delay or default arising from ‘Force Majeure’ such as caused by an accidental fire not caused due to neglect and / or default, flood, war, Act of God, civil or military commotion, strike or lockout, at THEIR WORKS, Acts of Government of India, provided notice on occurrence of any such events is immediately intimated to GSL in writing within maximum period of fifteen days of such occurrence to the entire satisfaction of GSL. Strikes/lockout at works of subcontractors of the Firm will not be considered as Force Majeure.
  20. Secrecy
    Firm shall not divulge any information about our drawings, documents, specifications etc. concerning this enquiry/order to any other party.
  21. Training
    Firm will be required to provide training with respect to operation, testing maintenance & repairs or the equipment to GSL and owners team at their works or on boards as may be considered necessary. Training will also include Classroom instruction if any. Training to be provided free of cost.
  22. Arbitration
    In the event of any question, dispute or differences arising under this Agreement or in connection there with the same shall be referred to the sole arbitration of the Chairman & Managing Director of GSL or if his designation is changedor his office is abolished, then in such cases to the sole arbitration of the officer for the time being entrusted with the functions of Chairman & Managing Director of GSL Vasco by whatever designation such officer may be called (hereinafter referred to as the said officer) and if the Chairman & Managing Director or the said officer is unable or unwilling to act as such to sole arbitration, some other person appointed by the Chairman & managing Director or the said officer. There will be no objection to any such appointment that the arbitrator to any such appointment that the arbitrator is a Government servant or that her has to deal with the matter to which the agreement relates or that in that course of his duties as a Government servant that he has expressed views on all or any such of the matters in dispute or indifference. The award of the arbitrator shall be final and binding on the parties. It is the terms of the agreement that in event of such arbitrator to whom the matter is referred, being transferred or vacating his office or being unable to act for any reason whatever, the said officer shall appoint another person to act as arbitrator in accordance with the terms of the agreement and the person as appointed shall be entitled to proceed with reference from the stage of which it was left out by his predecessor.
  23. Jurisdiction
    In the event of any dispute same will be subject to jurisdiction of Vasco-da-Gama, Goa, INDIA.
  24. Individuality of Contract
    In the event of an order, the same shall be treated as an individual contract, and shall not allow any general lien to the firm and shall not get prejudice in extension due to any situation arising out of some other contract that the firm may have with GSL.
  25. Base & depot Spares
    Quotation in quadruplicate for maker’s recommended Base & Depot Spares for 5 years maintenance valid for 180 days should be supplied along with one set of CPL/PIL within 4 weeks of placement or order the equipment.
  26. Product Support
    Firm will provide lifetime product support by way of spares, components and services when required by GSL or owners of the ship.
  27. Validity
    Firm’s offer should be valid for minimum 90 days from the date of enquiry.
  28. Deviations
    In case the firm is unable to meet the requirements of the specification due to their design of the equipment or due to non availability of some items indigenously or due to some other technical reasons these deviations should be listed separately in quotation with detailed justification there or for GSL’s approval failing which it will be presumed that the firm would meet all the requirements specified in our Enquiry and its Annexure & Drawings.
  29. Order Acknowledgement
    In the event of an order acknowledgement and acceptance of the order including all terms & conditions on the GSL prescribed format is to be submitted by the firm.
  30. Pending Order with the Firm other shipyards
    Firm is required to submit the details of the pending orders from the shipyards. The complete details should include:- i. Name of Customer ii. Purchase Order number & date iii. Original contractual date of delivery iv. Extended date of delivery actual supplies made, reasons of delay and tendency, if any v. E.D.C. (expected date of Completion) etc.
  31. Modifications to the equipment Seatings :
    “In case of any changes between the binding drawings submitted by you and the equipment and if it requires modifications to the seatings will be charged to you. Hence you are to ensure that there is no difference between the binding drawings and the equipment”.
  32. “Price Negotiations may not be carried out with the parties and that the contract is likely to be awarded to the lowest tenderer, if the offer is technically acceptable and the prices are found to be reasonable”.
  33. Statutory Regulations :
    In case of any work required to be carried out inside our premises, in connection with the order placed by us, the supplier shall have to COMPLY with all statutory Rules & Regulations such as ESI, PF Act, Family Pension Scheme Etc.
  34. General:
    The rates must confirm to the units indicated on the inquiry. The quotation should be submitted in a sealed cover prescribed with the GSL Enquiry reference number & closing date.

While forwarding your quotation following may please be noted:

  1. Please acknowledge receipt of enquiry (Immediately on receipt) by fax to (0832) 512148 / 513260 / 513870 and intimate whether you would be quoting or not. Quotation may be sent thereafter.
  2. All quotations to be sent in sealed envelopes only-unless asked otherwise
  3. Quotations to be sealed and sent through Courier / Mail clearly super scribing envelope with – Enquiry No. & Date and Due Date of opening.
  4. All processing Bank charges will be to your account. GSL will not bear any Bank charges. You may therefore, quote accordingly.
  5. “C” Forms, wherever applicable, will be issued only once against each order and on completion of supplies.

Vendor

  • Vendor
    • Supplier Bill Status
    • Annual Procurement Plan for MSME Vendors
    • Annual Procurement Plan for MSME FY 2021-22
    • Vendor Status
    • Vendor Registration Policy
    • GSL Online Vendor Registration System
    • Vendor Holiday Policy
    • Vendor Rating Process
    • Vendor Registration Form
    • Application for Enrollment as Civil Contractor
    • ECS/RTGS Mandate Form for Suppliers
    • Terms and Conditions
    • Financial Support to MSMEs in ZED Certification Scheme
Site Visitors : 284950

Contact Us

VASCO-DA-GAMA, GOA-403802
+91-832-2512152 (5 LINES) / 2513954 / 2512359
contactus[at]goashipyard[dot]com

Follow us on Twitter :
@cmdgsl
@goashipyardltd

Other Links

Image of National Career Service Image of National Voters Service Portal Image of Government of India Image of Central Vigilance Manual Image of Aero India Image of Central Public Procurement Portal Image of Defence Investors Cell Image of Digital india Image of GeM Portal Image of India Investment Grid Image of Ministry of Defence Image of Niti Aayog Image of Samanvay Image of Skill India
Website PoliciesPrivacy PolicyTerms & ConditionsDownload Corporate BrochureHelpFeedback

Copyright © 2022 - All Rights Reserved - Official Website of Goa Shipyard Limited, Government of India
Note: Content on this website is published and managed by Goa Shipyard Limited
For any query regarding this website, please contact the web information manager-
Shri. M. KALAIYARASAN (Additional General Manager (Information Technology))
E-mail ID : dgmedp-gsl[dot]goa[at]nic[dot]in
Contact No : +91-832-2513562

Image of W3C Validator CSS Image of W3CAG 2.0 Back to Previous Page | Last Updated Date : 14/05/2021